back

News Detail

menu

Operation Process Of Rubber Paver Machine(Part 2)

Time:2022-09-14

1. When the Rubber Paver Machine operates on a large slope (15%-20% vertical and horizontal slope), in order to prevent overturning, a heavy-duty tractor or bulldozer can be used if necessary, and the paver is connected with a wire rope. Drive at the same speed parallel to the paver;

2. Before the driver leaves the driving platform, the Rubber Paver Machine should be stopped steadily, the parking brake must be reliable, the side wall of the hopper should be completely lowered, and the screed should be placed on the ground or hung with hooks;

3. The crawler-type Rubber Paver Machine cannot travel for long distances, and the driving distance should not exceed 1 km. When it is necessary to travel for a long distance, the traveling device should pay attention to refueling;

4. When transferring, it is strictly forbidden to shift gears on the slope or slide in neutral;

5. When the Rubber Paver Machine is towed by other vehicles, wire ropes cannot be used, only rigid tow bars are allowed;

6. It is forbidden to use Rubber Paver Machine to pull other machinery;

7. When cleaning Rubber Paver Machine with diesel oil, keep away from open flame;

8. When the Rubber Paver Machine is parked near the traffic lane, obvious safety signs must be set up around it, and light signals should be set up at night and guarded by special personnel.

Operation Process Of Rubber Paver Machine(Part 2)