back

Products Detail

menu

Ground Material Mixing And Loading Station

  • Introduction
  • Main Parameter
  • Photos
  • Comment

Introduction of Ground Material Mixing And Loading Station

1.Ground Material Mixing And Loading Station can achieve the automatic operation by PLC. It reduces the number of workers and the labor intensity, the whole material-mixing process is continuous and high-efficiency.
2.The sieving function can separate the useless large particles on the ground, which can avoid the waste of the transportation capacity when the waste materials are delivered to the underground. It can also reduce the risk of underground pipe plugging.
3.Ground Material-Mixing And Loading Station has automatic control which can make the materials-mixing ratio more accurate, reduce the rebound ration of the concrete spray, and improve the shotcreting strength.

Parameter of Ground Material Mixing And Loading Station

No.

ITEM

UNIT

PARAMETER

1

Effective volume of the sand & gravel silo

2×4

2

Measuring accuracy

_

±2%

3

Proportioning period

s

≤60

4

Belt machine power

Kw

3×2.2

5

The volume of storage hopper

m3

1.2

6

Machine weight

kg

2000

Photos of Ground Material Mixing And Loading Station

Comment of Ground Material Mixing And Loading Station

Your Name

Email or inquiry@chinacoalintl.com

Tel/Wechat/Whatsapp or +8615376502861 Your Tel

CountryYour Country

Enquiry

Related Products