Concrete Gunite Shotcrete Machine Maintenance

Time:2017-08-29

Earlier Concrete shotcrete machine appearred as a pump products , it is the working chamber by means of periodic changes in volume to achieve the purpose of transmission fluid. Its main role is in the process of drilling mud into the hole with the drill bit, play a bit cool, clean drilling, fixing the wall, drive drilling and cuttings back to the role of the ground after drilling. Drilling mud pump is an important part of machinery and equipment.
Maintenance Considerations
1. Overhaul Dry mix shotcrete machine must be turned off valves, pumps are not allowed to close the valve repaired; 2. When moving transport mud pump, pay special attention not to damage the two gear pumps in the lifting, if necessary, recommend demolition custody; Or overhauled pump
3. The new pump, commissioning period lOOh, during the pre-commissioning operation 30h, 3h to be cleaned once per each oil filter, replace the entire operation after 50h lubricants and transmission and oil tank cleaning;
4.The commissioning of the l00h, pump load, torque, pressure, speed, etc. should be 50% to 75% of the rated value;
5. Commissioning period, bearings, guides packing boxes, transmission gear, etc. The temperature must not exceed 75 ℃, the oil must flow, oil pressure should be 0.1 ~ 0.4 (MPa) between;
6. The new pump is running 50h, lubricating oil must be replaced after each operation 700h, change the oil once again;
7. When the oil change, you should try to put the old oil, adding l00kg diesel pump 5min cleaning recapture net, after cleaning plus oil filter;
8. cement Grouting Pump valve should be checked monthly or once every 300h, ensuring flexible and reliable;
9. Every job for a week or 250h to clean filters and magnetic filters;
10. After long-term operation, to check the work of the universal shaft, cardan shaft lubrication nipple should oiling once a week.