The reasons for the sticky filling of the feeding mixer are:
1. Return to the factory to check the amount of water in the tank
When returning to the station after leaving the train, check the amount of water in the water storage tank of the feeding mixer, and make the water in the feeding mixer tank full at any time, in case of emergency.
2. Bring water reducing agent with the car
The water reducing agent is a concrete admixture that can reduce the water consumption for mixing while maintaining the slump of the concrete. It can be carried with the car and can adjust the concrete well. However, when adding the water reducing agent, you must remember that there are people from the laboratory of the commercial concrete station, otherwise the strength of the concrete is not enough and the driver will have to bear the consequences.
3. Reduce the travel time of the feeding mixer
The concrete transportation distance is generally within 30 kilometers in diameter. Plan the route and vehicle traffic before leaving the vehicle to minimize the time of the automatic feeding mixer on the road.
4. Check the concrete quality before the feeding mixer leaves the factory
The quality of each plate of concrete may vary due to different raw materials. When the concrete is installed and leaving the site, it is necessary to check the slump of the concrete in the tank and its ease, and be careful about the pre-settling of the concrete and the delamination of the concrete.
5. Reduce loss and discharge first
If you encounter human factors or force majeure that cause unloading for a long time, you should check the concrete situation in the tank at any time. Once you find that the concrete begins to set. Discharge immediately after reporting to the person in charge to prevent the entire tank from being scrapped.
The above is about the reasons for the sticky filling of the feeding mixer, I hope it can help you!